Share

Simone Fratini

Email:
simone.fratini@istc.cnr.it
Address: 

Via San Martino della Battaglia 44 - 00161 Rome - Italy

Profile

Position: 
Associate Researcher
Short profile: 

[M.Sc. 2002, PhD 2006, Computer Science Engineering, University of Roma La Sapienza]

I started my collaboration with CNR in 2001 with my M.Sc. thesis.  I have been Research Assistant from 2005 to 2007 and a Research Scientist (Fixed Term) from 2008 to October 2011.

Since November 2011 I am a Researcher at the Advanced Mission Concepts & Technologies Office, European Space Operations Centre, European Space Agency (ESA-ESOC), Darmstadt, Germany and a research associate at ISTC-CNR.

My main interest is in timeline-base planning and execution.  I took part in the space project of the PST Lab and, in particular, have been the main designer and developer of the APSI TRF (the Timeline-based Representation Framework) the reusable software framework for developing Planning and Scheduling Systems with a timeline-based approach.

Publications


Journal articles

   2011
Cesta A., Cortellessa G., Fratini S., Oddi A., Bernardi G. Deploying Interactive Mission Planning Tools - Experiences and Lessons Learned. In: Journal of Advanced Computational Intelligence and Intelligent Informatics, vol. 15 (8) pp. 1149 - 1158. Fuji Press, 2011.  image   image
Cesta A., Finzi A., Fratini S., Orlandini A., Enrico T. Flexible Plan Verification: Feasibility Results. In: Fundamenta Informaticae, vol. 107 (2-3) pp. 111 - 137. IOS Press, 2011.  image   image
Cesta A., Cortellessa G., Fratini S., Oddi A. MrSPOCK: Steps in Developing an End-to-End Space Application. In: Computational Intelligence, vol. 27 (1) pp. 83 - 102. Wiley Periodicals, 2011.  image   image
   2010
Bartak R., Fratini S., McCluskey L. The Third Competition on Knowledge Engineering for Planning and Scheduling. In: AI MAGAZINE, vol. 31(1) pp. 95 - 98. 2010.
Cesta A., Finzi A., Fratini S., Orlandini A., Tronci E. Validation and Verification Issues in a Timeline-Based Planning System. In: KNOWLEDGE ENGINEERING REVIEW, vol. 25(3) pp. 299 - 318. 2010.
   2008
Fratini S., Pecora F., C., A. Unifying Planning and Scheduling as Timelines in a Component-Based Perspective. In: Archives of Control Sciences, vol. 18(2) pp. 231 - 271. 2008.
   2007
Cesta A., Cortellessa G., Denis M., Donati A., Fratini S., Oddi A., Policella N., Rabenau E., Schulster J. MEXAR2: AI Solves Mission Planner Problems. In: IEEE INTELLIGENT SYSTEMS, vol. 22 pp. 12 - 19. 2007.
   2005
Cesta A., Fratini S. Controlling Complex Physical Systems Through Planning and Scheduling Integration. In: LECTURE NOTES IN ARTIFICIAL INTELLIGENCE, vol. 3533 pp. 197 - 207. 2005.

Contribution to Book/Monograph

   2008
Cesta A., Cortellessa G., Denis M., Donati A., Fratini S., Oddi A., Policella N., Rabenau E., Schulster J. Continuous Plan Management Support for Space Missions: the RAXEM Case. Amsterdam: IOS Press, 2008.
   2007
Cesta A., Cortellessa G., Fratini S., Oddi A., N. P. An Innovative Product for Space Mission Planning -- an a posteriori evaluation. Menlo Park: AAAI Press, 2007.
   2005
Cesta A., Fratini S., Oddi A. Planning with Concurrency, Time and Resources: A CSP-Based Approach. Hershay, PA: Idea Group Publishing, 2005.

Proceedings

   2010
Cesta A., Finzi A., Fratini S., Orlandini A., Tronci E. Analyzing Flexible Timeline-based Plans. In: ECAI 2010 - 19th European Conference on Artificial Intelligence (Lisbon, Portugal, ). Proceedings, 2010.
Cesta A., Cortellessa G., Fratini S., Oddi A., B., G. Deploying Interactive Mission Planning Tools - Experiences and Lessons Learned. In: i-SAIRAS-10 - International Symposium in Artificial Intelligence, Robotics and Automation in Space (Sapporo, Japan, ). Proceedings, 2010.
Cesta A., Finzi A., Fratini S., Orlandini A., T., E. How Hard is Verifying Flexible Temporal Plans for the Remote Space Agent?. In: KEPS 2010 (Toronto, Canada, ). Proceedings, 2010.
Orlandini A., Finzi A., Cesta A., Fratini S., Tronci E. Formal Methods for Plan-based Robot Autonomy: A Case Study. In: PlanSIG 2010 (Brescia, Italy, ). Proceedings, 2010.
   2009
Cesta A., Finzi A., Fratini S., Orlandini A., T., E. Flexible Timeline-Based Plan Verification. In: KI 2009 (PADERBORN, GERMANY, ). Proceedings, 2009.
   2008
Cesta A., Fratini S., Oddi A., Pecora F. APSI Case#1: Pre-planning Science Operations in Mars Express. In: i-SAIRAS-08, Proceedings of the 9th International Symposium in Artificial Intelligence, Robotics and Automation in Space, JPL, (Hollywood, USA, ). Proceedings, 2008.
Cesta A., Cortellessa G., Fratini S., Oddi A. Looking for MrSPOCK: Issues in Deploying a Space Application. In: SPARK-08. Scheduling and Planning Applications woRKshop at ICAPS (, Sidney (Australia), ). Proceedings, 2008.
Cesta A., Finzi A., Fratini S., Orlandini A., T., E. Merging Planning, Scheduling & Verification - A Preliminary Analysis. In: ASTRA-08, 10th Workshop on Advanced Space Technologies for Robotics and Automation (Noordwijk (The Netherlands), ). Proceedings, 2008.
Cesta A., Cortellessa G., Fratini S., O. MrSPOCK: Generating a Planning System through a Timeline Representation Framework. In: ASTRA-08, 10th Workshop on Advanced Space Technologies for Robotics and Automation (Noordwijk (The Netherlands), ). Proceedings, 2008.
Cesta A., Fratini S., Pecora F. Planning with Multiple-Components in OMPS. In: IEA/AIE 2008 - New Frontiers in Applied Artificial Intelligence, 21st International Conference on Industrial, Engineering and Other Applications of Applied Intelligent Systems, IEA/AIE 2008. Proceedings (Wroclaw, Poland, 18-20 June 2008). Proceedings, pp. 435 - 445. L. Borzemski, A. Grzech, M. Ali (eds.). (Lecture Notes in Artificial Intelligence, vol. 5027). Springer, 2008.  image   image   image
Cesta A., Cortellessa G., Denis M., Donati A., Fratini S., Oddi A., Policella N., Rabenau E., Schulster J. RAXEM - Supporting Command Uplink in Mars Express. In: i-SAIRAS-08, 9th International Symposium in Artificial Intelligence, Robotics and Automation in Space, JPL, CA, (Hollywood, USA, ). Proceedings, 2008.
Cesta A., Fratini S. The Timeline Representation Framework as a Planning and Scheduling Software Development Environment. In: lanSIG-08. Proceedings of the 27th Workshop of the UK Planning and Scheduling Special Interest Group (Edinburgh (UK), ). Proceedings, 2008.
Cesta A., Finzi A., Fratini S., Orlandini A., Tronci E. Validation and Verification Issues in a Timeline-based Planning System. In: KEPS-08. ICAPS Workshop on Knowledge Engineering for Planning and Scheduling (Sidney (Australia), ). Proceedings, 2008.
Cortellessa G., Cesta A., Fratini S., Oddi A., Policella N. User interaction with an AI tool: The RAXEM experience. In: Workshop on Usable Artificial Intelligence at CHI-08 (Florence (Italy), ). Proceedings, 2008.
Donati A., Policella N., Cesta A., Fratini S., Oddi A., Pecora G., Schulster F., Rabenau J., Niezette E., Steel M., R. Science Operations Pre-Planning & Optimization using AI constraint-resolution - the APSI Case Study 1. In: SpaceOps-08. Proceedings of the 10th International Conference on Space Operations (Heidelberg (Germany), ). Proceedings, 2008.
Rabenau E., Donati A., Denis M., Policella N., Schulster J., Cesta A., Cortellessa G., Fratini S., Oddi A. The RAXEM Tool on Mars Express - Uplink Planning Optimisation and Scheduling Using AI Constraint Resolution. In: SpaceOps-08. Proceedings of the 10th International Conference on Space Operations (Heidelberg (Germany), ). Proceedings, 2008.
   2007
Cesta A., Fratini S., P., F. Multi-Component Framework for Planning and Scheduling Integration. In: PlanSIG-07. Proceedings of the 26th Workshop of the UK Planning and Scheduling Special Interest Group (Prague, Czech Republic, ). Proceedings, 2007.
   2006
Cesta A., Oddi A., Cortellessa G., Fratini S., P., N. AI Based Tools for Continuous Support to Mission Planning. In: 9th International Conference on Space Operations (SpaceOps 06), (Roma, ). Proceedings, 2006.
Cesta A., Cortellessa G., Fratini S., Oddi A., Policella N. From Demo to Practice: the MEXAR Path to Space Operations. In: IEA/AIE 2006 - Advances in Applied Artificial Intelligence, 19th International Conference on Industrial, Engineering and Other Applications of Applied Intelligent Systems, IEA/AIE 2006. Proceedings (Annecy, France, 27-30 June 2006). Proceedings, pp. 421 - 431. M. Ali, R. Dapoigny (eds.). (Lecture Notes in Artificial Intelligence, vol. 4031). Springer, 2006.  image   image   image
Cesta A., Cortellessa G., Fratini S., Oddi A., N. P. MEXAR2 - An Operational Tool for Continuous Support to Mission Planning. In: 5th International Workshop on Planning and Scheduling for Space, IWPSS-06 (Baltimore, MD, USA, ). Proceedings, 2006.
Fratini S., C., A. A Planning and Scheduling Tool to Automate and Support Mission Planning. In: the 9th International Conference on Space Operations (SpaceOps 06) (Rome, Italy, ). Proceedings, 2006.
   2005
Fratini S., Cesta A., Oddi A. Extending a Scheduler with Causal Reasoning: a CSP Approach. In: CPPS-05 Workshop on Constraint Programming for Planning and Scheduling (Monterey, California, ). Proceedings, 2005.
Fratini S., Cesta A. The Integration of Planning into Scheduling with OMP. In: 2nd Workshop on Integrating Planning into Scheduling (WIPIS) at AAAI-05 (Pittsburgh, USA, ). Proceedings, 2005.

Abstracts

   2007
Cesta A., Cortellessa G., Fratini S., Oddi A., N. P. MEXAR2 : a software tool for MARS EXPRESS data dumping activities. In: Working Notes of the ICAPS-07 Demo Program (Providence, RI, USA, 2007).
Cesta A., Cortellessa G., Fratini S., Oddi A., P., N. RAXEM: Toward a Systematic Approach to Support Mission Planning. In: Workshop on Artificial Intelligence for Space Applications at IJCAI-07 (Hyderabad, India, 2007).